首页> 外文期刊>Seismological research letters >Performance of the GFZ Decentralized On-Site Earthquake Early Warning Software (GFZ-Sentry): Application to K-NET and KiK-Net Recordings, Japan
【24h】

Performance of the GFZ Decentralized On-Site Earthquake Early Warning Software (GFZ-Sentry): Application to K-NET and KiK-Net Recordings, Japan

机译:GFZ的性能分散地震现场地震预警软件(GFZ-SENTRY):应用于K-NET和KIK-NET录音,日本

获取原文
获取原文并翻译 | 示例
           

摘要

In this article, we report on the application of GFZ-Sentry software for decentralized on-site earthquake early warnings to a large data set of recordings collected by the Japanese K-NETand KiK-net seismic networks. The data set is composed of 3,225 three-component recordings from 24 seismic events. The magnitudes of the selected earthquakes fall into a range of M-JMA 6.0-7.3 (M-w 5.7-6.9) and cover hypocentral (epicentral) distances between 5 and 107 km (2 and 103 km, respectively). The data have been coordinated in real time with velocity and displacement; in this manner, the peak ground displacement (Pd) within the first few seconds (to a maximum of 3 s) after the P-wave arrival in the vertical component is determined. This value is used to estimate the peak ground velocity (the median, along with the associated 16% and 84% confidence intervals) on the horizontal components using empirical relationships. Based on these values, the traffic light status (green, orange, red) is then determined following the methodology introduced by Parolai et al. (2015), which uses three matrices to show the relationship between the expected ground motion and the possible damage (in terms of seismic intensity) that may arise. The performance of the software was evaluated without making ad hoc calibrations for the area or the selected thresholds and was found to be quite reliable.
机译:在本文中,我们报告了GFZ-Sentry软件在日本K-Netand Kik-Net地震网络收集的大型数据集中将GFZ-Sentry软件应用于分散的现场地震早期警告。数据集由来自24个地震事件的3,225个三分录制组成。所选地震的大小落入一系列M-JMA 6.0-7.3(M-W 5.7-6.9),覆盖5到107公里之间的斜视(震中)距离(分别为2和103公里)。数据已实时协调,速度和位移;以这种方式,确定在确定垂直分量中的P波到达后的前几秒内的峰接口(PD)在垂直分量中的P波到达之后。使用经验关系,该值用于估计峰值接地速度(中值以及相关的16%和84%置信区间)。基于这些值,然后按Parolai等人引入的方法确定交通灯状态(绿色,橙色,红色)。 (2015),使用三个矩阵来显示可能出现的预期地面运动与可能损坏的关系,可能出现的损坏(在地震强度方面)。对该软件的性能进行评估而不为该区域或所选阈值制定ad hoc校准,并且发现是非常可靠的。

著录项

  • 来源
    《Seismological research letters》 |2017年第6期|共11页
  • 作者单位

    Helmholtz Ctr Potsdam GFZ German Res Ctr Geosci Ctr Early Warning Syst Sect D-14473 Potsdam Germany;

    European Ctr Geodynam &

    Seismol 19 Rue Josy Welter L-7256 Walferdange Luxembourg;

    Helmholtz Ctr Potsdam GFZ German Res Ctr Geosci Ctr Early Warning Syst Sect D-14473 Potsdam Germany;

  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类 地震学;
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号