Institutional logics of processing safety in production: The case of heat stress management in a megaproject in Australia

机译:生产安全性的制度逻辑:澳大利亚Megaproject中热应力管理的案例

获取原文
获取原文并翻译 | 示例
           

摘要

Despite evidence that a safe and healthy workforce is essential to construction project productivity, the resources and time committed to safety are often perceived as counterproductive. This study explores the multiple institutional logics underpinning the duality between safety and productivity in the construction industry. Specifically, it explores the tensions between safety and production through an institutional lens by untangling the institutional logics of processing safety in production. A theory of protection, production and reconciling logics is developed and refined through an in-depth case study of heat stress management in a mega-project in Australia. Ethnographic data were collected over a six-day working week on site, interpreted using institutional analysis and conceptualized with a grounded theory approach. The results confirmed the co-existence of the three logics in the power dynamics between employers, unions, regulators and workers. It is found that the production and the protection logic leads to paradoxical effect of their desired goals, and a reconciling logic emerges in the bottom-up initiatives which aims for community building and leads to improvement in both safety and productivity. However, the reconciling logic was found incomplete and handicapped due to the lack of involvement at senior management level and the production side of the project organization.
机译:尽管有证据表明,安全健康的劳动力对建设项目生产力至关重要,但致力于安全的资源和时间通常被认为是适得其反的。本研究探讨了跨越建筑业安全性和生产力的二元性的多种制度逻辑。具体而言,它探讨了通过制度镜头通过非制度镜头通过制度透镜进行安全和生产之间的紧张局势。通过在澳大利亚的Mega-Project中的热力管理的深入案例研究制定和精制保护,生产和协调逻辑。在现场的六天工作周内收集了民族图数据,用机构分析解释并以接地的理论方法概念化。结果证实了雇主,工会,监管机构和工人之间的动力动力学三个逻辑的共存。结果发现,生产和保护逻辑导致其所需目标的矛盾效果,并在旨在社区建设的自下而上的举措中,举办的协调逻辑,并导致安全性和生产力的提高。然而,由于高级管理水平和项目组织的生产方面缺乏参与,重新调整逻辑被发现不完整和障碍。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号