...
首页> 外文期刊>Model Engineer >L&NWR 0-8-2T Heavy Shunting Tank Locomotive - PART 4
【24h】

L&NWR 0-8-2T Heavy Shunting Tank Locomotive - PART 4

机译:L&NWR 0-8-2T重型坦克机车 - 第4部分

获取原文
获取原文并翻译 | 示例
           

摘要

One of the quirks of the L&NWR 0-8-0 series of locomotives was that the crank axle was supported along the axis of the chassis by a major centre bearing assembly between the stay under the boiler and the rear face of the motion plate. This not only stiffened the frame at this point but helped take the thrust of the pistons when the locomotive was working hard. Latterly, the engines were stripped of this feature when they came under LMS ownership but to be prototypical I wanted to reproduce the original bearing assembly.
机译:L&NWR 0-8-0系列机车系列的一个怪人是曲柄轴沿着底盘的轴线支撑在锅炉下方的锅炉和运动板的后表面之间的主要中心轴承组件。 这不仅在这一点上加强了框架,而且当机车努力工作时帮助采取活塞的推力。 后者,当他们受到LMS所有权的情况下,引擎被剥离了这一功能,而是要成为原型我想要再现原始轴承组件。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号