Assembly of the firs operational F-22 Raptor air superiority fighter is underway at Lockheed Martin Aeronautics Company facilities in Fort Worth, Texas. Assembly of the mid-fuselage for Raptor 4018, as this F22 is designated, will take approximately 11 months. Once completed, it will be delivered to Lockheed Martin Aeronautics' Marietta, Ga., facility, where the aircraft's forward fuselage, wings, aft fuselage, and vertical and horizontal tails will be attached and its F119 engines will later be installed. Delivery of Raptor 4018 to Tyndall AFB is tentatively scheduled for early 2003.This comes after Air Force officials announced earlier this year, the completion of the final two requirements for initial production - first flight of Raptor 4006 and initiation of radar cross section testing.
机译:在德克萨斯州沃思堡的洛克希德·马丁航空公司的设施中,正在组装第一架F-22“猛禽”战斗机。按照F22的命名,猛禽4018的机身中部组装大约需要11个月的时间。一旦完成,它将被交付给洛克希德·马丁航空公司位于佐治亚州马里埃塔的工厂,该工厂将安装飞机的前机身,机翼,后机身以及垂直和水平尾翼,并在以后安装F119发动机。 Raptor 4018初步定于2003年初交付廷德尔空军基地,这是在空军官员于今年早些时候宣布完成首批生产的最后两项要求之后-Raptor 4006的首次飞行和开始进行雷达横截面测试。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号