...
首页> 外文期刊>Foster Natural Gas Report >Rover Gains OK for New Compressor, Loses Rehearing on Blanket Certificate
【24h】

Rover Gains OK for New Compressor, Loses Rehearing on Blanket Certificate

机译:Rover获得新的压缩机,丢失在毯子证书上进行重新入学

获取原文
获取原文并翻译 | 示例

摘要

Rover Pipeline LLC was not successful in its attempt to gain a blanket certificate to perform routine construction activities, as FERC determined in a November 30 order (CP15-93) that the company cannot be trusted to comply with FERC’s blanket certificate regulations. The order denied the rehearing request of Rover, which is building a $4.2 billion pipeline to transport up to 3.25 Bcf/d of natural gas from the Marcellus and Utica Shale region to markets in Ohio and Michigan, with pipeline connections to reach market hubs in the U.S. and Canada. The project has seen plenty of controversy, including the destruction of a building in 2016, before it received FERC’s order granting a Natural Gas Act (NGA) section 7 certificate.
机译:Rover Pipeline LLC在尝试获得毯子证书以执行常规建设活动的计划,因为在11月30日(CP15-93)中确定了该公司不能遵守FERC的毯子证书法规。 该命令否认了流浪者的重新入学要求,该罗孚的要求是在俄亥俄州和密歇根州的Marcellus和Utica Shale地区的市场上运输到42亿美元的渠道,以便在俄亥俄州和密歇根州的市场,其中包括管道连接到达市场中心 美国和加拿大。 该项目有很多争议,包括在收到FERC的命令(NGA)第7条证书之前,在2016年销毁了2016年建筑物的破坏。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号