首页> 外文期刊>Foster Natural Gas Report >Energy Transfer Partners' Crude Oil Gathering Project Would Support Sunoco Pipeline's Delaware Basin Extension
【24h】

Energy Transfer Partners' Crude Oil Gathering Project Would Support Sunoco Pipeline's Delaware Basin Extension

机译:能源转移伙伴的原油集合项目将支持Sunoco Pipeline的特拉华盆地延伸

获取原文
获取原文并翻译 | 示例
           

摘要

ETP Crude LLC (OR15-38) petitioned FERC to issue a declaratory order approving the overall tariff and rate structure, proration procedure and the other matters for a new crude oil pipeline that will have the capacity to accept approximately 120,000 barrels per day (b/d) of crude oil from receipt points located in Reeves County, Texas and Lea County, New Mexico for transportation to delivery points in Loving County, Texas and Lea County, New Mexico. This project will consist of three separate gathering systems, constituting approximately 130 miles of total pipeline, the applicant told FERC, and it will enable producers and marketers in the rapidly expanding Delaware Basin to deliver crude oil into Sunoco Pipeline LP’s Delaware Basin Extension (a 130- mile pipeline) for delivery to both interstate and intrastate markets. ETP asked the Commission to rule favorably no later than 12/1/15 to help ensure that the facilities are ready during the first half of 2016.
机译:ETP粗鲁LLC(OR15-38)请愿氟厄斯颁布批准整体关税和利率结构,奖金程序和新原油管道的其他事项的宣言令,将拥有每天约120,000桶的能力(B / d)来自RECEPT积分的原油,位于REEVES县,德克萨斯州德克萨斯州和lea县,新墨西哥州的德克萨斯州,德克萨斯州德克萨斯州,德克萨斯州新墨西哥州的交付点。 申请人告诉FERC,该项目将包括三个单独的采集系统,构成大约130英里的总管道,并使生产者和营销人员能够在迅速扩大的特拉华盆地将原油送入Sunoco Pipeline LP的Delaware盆地延伸(A 130 - 英里管道),用于交付州际和套期市场。 ETP要求委员会统治不到12/1/15,以帮助确保设施在2016年上半年准备就绪。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号