首页> 外文期刊>Engineering Geology >A simple method to evaluate the performance of an intercept dam for debrisflow mitigation
【24h】

A simple method to evaluate the performance of an intercept dam for debrisflow mitigation

机译:一种评估拦截水坝的性能的简单方法

获取原文
获取原文并翻译 | 示例
           

摘要

This study aimed to establish a simple approach to evaluate the performance of an intercept dam during a debris-flow event. We applied the two-phase debris-flow model proposed by Pudasaini (2012) and combined it with the dam moment-balance equation, to describe the state of the debris flow and the structural integrity and functions of such dams. To delineate dam performance, we introduced two new variables, representing reservoir capacity and anti-overturning stability of the dam, respectively. In addition, we developed a grid optimization technique to improve calculation efficiency. The feasibility of the proposed model was validated by simulating a debris-flow event in the Hongchun catchment, Sichuan, China, where a system of structures had been constructed to prevent debris flows, or to mitigate the possible hazard. Our results suggested that the process of debris-flow propagation and the variation in dam performance caused by the interaction between the debris motion and the dam were appropriately described. Further, we have presented a discussion on dam collapse and solid-fluid separation to clarify their effects on debris-flow mitigation.
机译:本研究旨在建立一种简单的方法来评估碎片流动事件期间拦截坝的性能。我们应用了Pudasaini(2012)提出的两相碎片流动模型,并将其与大坝力矩平衡方程组合,描述碎屑流动的状态和这种坝的结构完整性和功能。为了描绘大坝性能,我们介绍了两个新的变量,分别代表了水库容量和坝的防倾覆稳定性。此外,我们开发了一种电网优化技术,以提高计算效率。通过模拟中国四川红村集水区的碎片流动事件,验证了拟议模型的可行性,其中建造了一种结构系统以防止碎片流动,或减轻可能的危险。我们的研究结果表明,适当描述了碎片流动传播的过程和由碎片运动与大坝之间的相互作用引起的坝体性能的变化。此外,我们提出了关于坝塌陷和固体流体分离的讨论,以阐明它们对碎屑流动缓解的影响。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号