...
首页> 外文期刊>Engineering failure analysis >Mechanical behavior investigation on the formation of the plain dent of an API 5L L245 pipeline subjected to concentrated lateral load
【24h】

Mechanical behavior investigation on the formation of the plain dent of an API 5L L245 pipeline subjected to concentrated lateral load

机译:浓缩横向载荷的API 5L L245管道普通凹陷的形成力学研究

获取原文
获取原文并翻译 | 示例
           

摘要

As the main geometric defect in pipeline maintenance, dent has been paid more attention by pipeline managers because of its strong stress concentration. To investigate the formation mechanism of a pipeline dent, an indentation test of a pipe subjected to concentrated lateral load was carried out in the laboratory to simulate the formation process of the dent, and a 3D numerical model corresponding to the test was established to verify the results between the experiment and simulation. Subsequently, the stress and strain response of the dented pipeline was analyzed in detail in various stages of dent formation process. Deformation analysis revealed that the residual stresses state formed in the dented area after unloading is related to the depth of the dent, which may be in tension or in compression. During the formation of the dent, the pipeline presents "similar to"-type wave-like bending state in the axial direction. These dent formation mechanisms may provide a guidance for dent assessment studies.
机译:由于管道维护的主要几何缺陷,由于其强大的应力集中,管道管理人员已经更多地受到了更多的关注。为了研究管道凹痕的形成机制,在实验室中进行了经受浓缩横向载荷的管道的压痕试验,以模拟凹痕的形成过程,并建立了对应于测试的3D数值模型来验证实验和模拟之间的结果。随后,详细分析了牙齿形成过程的各个阶段的牙曲线的应力和应变响应。变形分析显示,在卸载后在凹陷区域中形成的残余应力状态与凹陷的深度有关,其可能处于张力或压缩中。在形成凹痕期间,管道在轴向上呈现“类似于”型型波状弯曲状态。这些凹痕形成机制可以提供凹痕评估研究的指导。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号