首页> 外文期刊>Energy processing Canada >Why Will the TransMountain Pipeline Expansion Get Built? Because it Will
【24h】

Why Will the TransMountain Pipeline Expansion Get Built? Because it Will

机译:为什么会建立的变速器管道扩展? 因为它会

获取原文
获取原文并翻译 | 示例
       

摘要

Forget all the common-sense reasons for starting and completing the TransMountain Expansion Project (TMEP). Forget that construction of the pipeline will start on September 17, 2017; that it will cost $7.4 billion to complete over two years; that 89 per cent of the pipeline will be built on existing rights of way or along already existing infrastructure; that revenue to Alberta and British Columbia will total about $25 billion, including construction and the first 20 years of tolls; that it makes economic sense to build a pipeline to tidewater, to diversify our customer base; that construction of the pipeline expansion will take 2800 tanker trucks or almost 900 railcars per day out of circulation; that taking those alternative forms of petroleum transport off the books makes life infinitely safer for both people and the natural environment.
机译:忘记启动和完成传输扩展项目(TMEP)的所有常识原因。 忘记在2017年9月17日开始的管道建设; 这将花费74亿美元以上完成两年; 该管道的89%将建立在现有的方式或已经存在的基础设施的现有权利上; 该收入与艾伯塔省和不列颠哥伦比亚省的收入总额约为250亿美元,包括建设和前20年的通行费; 这使得建立一个管道的经济意义,以使我们的客户群多样化; 这种管道扩张的建设将采用2800辆油轮卡车或近900辆射箭流通循环; 那些替代形式的石油运输从书籍中为人们和自然环境提供无限的生活。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号