...
首页> 外文期刊>Ecological restoration >Umbrella Arching and Compensation Grouting in Order to Protect Settlement-Sensitive Buildings over Large Shotcrete Excavations in Gravel
【24h】

Umbrella Arching and Compensation Grouting in Order to Protect Settlement-Sensitive Buildings over Large Shotcrete Excavations in Gravel

机译:伞拱形和补偿灌浆,以保护砂砾中大型喷射挖掘的解决敏感建筑物

获取原文
获取原文并翻译 | 示例
   

获取外文期刊封面封底 >>

       

摘要

The Tunnel Oberau, with a length of 2.9 km, forms the core of the local bypass of Oberau. Between the two massifs Kirchbichl and Muhlberg, the tunnel is situated in the valley of the Gie ss enbach in alluvial gravel with only a small overlap underneath settlement-sensitive buildings. In this paper, the measures in the tunnel to minimize the settlements of the buildings during the shotcrete excavations are described. Basis for this planning were extensive 3D-FE-calculations. Furthermore, under two buildings a compensation grouting measure was carried out, in order to compensate the occurring settlements. This paper describes how the required time and the amount of injection material (grout) could be reduced during the compensation grouting in highly permeable gravel.
机译:隧道Oberau,长度为2.9公里,形成了Oberau当地旁路的核心。 在两个受碎屑kirchbichl和muhlberg之间,隧道位于凝血砾石的Gie Ss Enbach的山谷中,只有沉降敏感建筑下的小重叠。 在本文中,描述了隧道中的措施,以最大限度地减少在喷射挖掘挖掘过程中建筑物的沉降。 该规划的基础是广泛的3D-FE计算。 此外,在两个建筑物下进行补偿灌浆测量,以便补偿发生的沉降。 本文介绍了在高度渗透砾石的补偿灌浆期间可以减少所需时间和注射材料(灌浆量)。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号