首页> 外文期刊>Ecological engineering: The Journal of Ecotechnology >Large weir construction causes the loss of seasonal habitat in riverine wetlands: a case study of the Four Large River Projects in South Korea
【24h】

Large weir construction causes the loss of seasonal habitat in riverine wetlands: a case study of the Four Large River Projects in South Korea

机译:大型堰建设导致河流湿地的季节性栖息地失去:以韩国四大河流项目为例

获取原文
获取原文并翻译 | 示例
           

摘要

From 2009 to 2012, South Korea carried out national-wide construction projects in four rivers; sixteen large-weirs were constructed to control flood risk and to secure water resources. Environmental impact assessment of the weir construction evaluated conditional changes by comparing post-survey records with pre-construction periods. However, the ecological assessment for the weir construction in a long-term perspective has been still limited. In this study, we compared the long-term dynamics of riverine habitat in two construction sites (Nakdong River and Geum River), and one reference site (Seomjin River) in South Korea using 33-years database of satellite imagery. We classified 30 m-grid riverine habitats into three temporal types (i.e., permanent water, seasonal water, and non-flooded habitat) based on annual flooding frequency and its temporal trend was compared. After weirs construction, the area of permanent water was increased (Nakdong R.: +36.0%, Geum R.: +10.9%); seasonal habitat and non-flooded habitat were decreased (Nakdong R: -36.5% and -37.4%; Geum R: -22.9% and -28.2%, respectively). And annual flux of habitat transitions into different habitat types has been decreased only in weir construction sites. Among different habitat transition categories, habitat change into permanent water was the highest during the weir construction periods. Our long-term analysis of riverine habitat can be used to understand temporal changes and recovery after weir construction and channel dredging.
机译:从2009年到2012年,韩国在四条河流中进行了全国范围的建筑项目; 16次大型堰被建造起来控制洪水风险并确保水资源。通过比较预制期的调查后记录,堰建设的环境影响评估评估了条件变化。然而,长期视角下堰建设的生态评估仍然有限。在这项研究中,我们使用33年的卫星图像数据库比较了两座建筑工地(Nakdhong River河)的河流栖息地的长期动态(Nakdong River和Geum River),以及韩国的一个参考网站(Seomjin River)。我们将30米栅格河滨栖息地分为三种时间(即永久性水,季节性水和非洪水栖息地),基于年前的洪水频率及其时间趋势进行了比较。在堰建设之后,永久性的面积增加(Nakdong R.: + 36.0%,Geum R.: + 10.9%);季节性栖息地和非洪水栖息地减少(Nakdong R:-36.5%和-37.4%; Geum R:-22.9%和-28.2%)。韦尔建筑工地仅减少了栖息地转型为不同栖息地的栖息地转型。在不同的栖息地过渡类别中,卫生部的栖息地变为永久性在堰施工期间最高。我们的长期分析河流栖息地可用于了解堰建设和渠道疏浚后的时间变化和恢复。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号