首页> 外文期刊>Acta Technica >Description of software determining optimum maintenance sequence for 110 kV power circuit breakers with SF_6
【24h】

Description of software determining optimum maintenance sequence for 110 kV power circuit breakers with SF_6

机译:确定使用SF_6的110 kV电力断路器的最佳维护顺序的软件的说明

获取原文
获取原文并翻译 | 示例
获取外文期刊封面目录资料

摘要

The third stage of work on the development of Reliability Centred Maintenance (RCM) software for distribution system network elements is described. Analysed is particularly the case of a 110 kV power circuit breakers with SF_6. The software design is based on RCM software and previously developed software for the maintenance of 110 kV VMM power circuit breakers and 110 kV/MV transformers. When determining an optimum maintenance sequence, the appropriate parameters of technical conditions and operational importance are required. The paper describes the structure of input databases and the possibilities of the first version of software which comprehensively addresses this issue for power circuit breakers with SF_6.
机译:描述了开发用于配电系统网络元素的以可靠性为中心的维护(RCM)软件的第三阶段工作。尤其是分析了带有SF_6的110 kV电力断路器的情况。该软件设计基于RCM软件和先前开发的软件,用于维护110 kV VMM电力断路器和110 kV / MV变压器。在确定最佳维护顺序时,需要适当的技术条件和操作重要性参数。本文描述了输入数据库的结构以及第一版软件的可能性,该软件全面解决了SF_6功率断路器的这一问题。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号