...
首页> 外文期刊>International journal of sustainable energy >Tidal stream energy resource assessment in the Qiantang River Estuary, China
【24h】

Tidal stream energy resource assessment in the Qiantang River Estuary, China

机译:中国钱塘江口潮气能源资源评估

获取原文
获取原文并翻译 | 示例
           

摘要

A tidal stream energy resource assessment can be achieved through direct measurements of tidal elevations or flow velocities, theoretical formulas, and numerical models. This paper first described the development of renewable energy in China. Then, the tidal stream energy resource in the Qiantang River Estuary was assessed. The present work established a 2D numerical model for calculating the power density in the estuary and validated it with in situ water level, tidal current, and suspended sediment concentration measurements. Three possible sites found near the Hangzhou Bay Bridge were selected for detailed resource assessment. The results indicated that if only 50 turbines are deployed to each site, the tidal stream energy output by all turbines would be 7.5?GWh/year. Finally, building a tidal stream power generation device into an existing bridge structure was proposed at the Qiantang River Estuary.
机译:通过直接测量潮汐升高或流速,理论公式和数值模型,可以实现潮汐流能量资源评估。 本文首先描述了中国可再生能源的发展。 然后,评估了钱塘河河口的潮流能源资源。 本作工作建立了一个2D数值模型,用于计算河口中的功率密度,并用原位水位,潮流和悬浮沉积物浓度测量进行验证。 选择杭州湾桥附近的三个可能的遗址进行详细资源评估。 结果表明,如果仅将50个涡轮机部署到每个站点,则所有涡轮机输出的潮气流量为7.5?GWH /年。 最后,在Qiantang River河口建议将潮汐流发电装置构建成现有的桥梁结构。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号