Strength Reduction Analysis for the Stability of Pile-Slope System

机译:桩-斜坡系统稳定性的强度折减分析

获取原文
获取原文并翻译 | 示例
   

获取外文期刊封面封底 >>

       

摘要

Numerical analyses by the 3D shear strength reduction technique were performed for stability of pile-slope system, in which the pile response and slope stability were considered simultaneously. An internal routine with FLAC3D based on dichotomy was developed to calculate the factor of safety of pile-slope system. The effects of the pile spacing, pile head conditions and pile positions on the safety factor were analyzed. The critical slip surface was found to be divided into two parts when the pile spacing is small, and these two parts gradually get connected with the increase of pile spacing until a clear critical slip surface is formed. Pile head conditions can considerably influence the stability of the piled slope, but this can not be indicated by the limit equilibrium method. The optimal pile position for slope reinforced with one row of piles was found to be located in the middle of the slope.
机译:利用3D抗剪强度折减法对桩-边坡体系的稳定性进行了数值分析,同时考虑了桩的响应和边坡的稳定性。开发了基于二分法的FLAC3D内部程序,以计算桩坡系统的安全系数。分析了桩距,桩头状况和桩位对安全系数的影响。当桩距较小时,发现临界滑动面可分为两部分,随着桩距的增加,这两个部分逐渐联系在一起,直到形成清晰的临界滑动面。桩头条件会极大地影响桩体边坡的稳定性,但是极限平衡法无法表明这一点。发现用一排桩加固的斜坡的最佳桩位置位于斜坡的中间。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号