With the ribbon barely cut to signify the start of production on the Boseto copper project, Discovery Metals Ltd is steaming ahead with expansion plans.First production from Boseto was announced on June 28 with concentrate grades in excess of 40% copper and 900 g/t silver achieved.Initially the company has designs on a throughput of 3 mtpa for production of 36,000 tpa copper and 1.1 mozpa silver over a scheduled 15-year mine life but plans are in place to test for an expansion to that model.
展开▼