首页> 外文期刊>Argus global LNG >Scarborough ‘can still be backfll’ for NWS LNG
【24h】

Scarborough ‘can still be backfll’ for NWS LNG

机译:对于NWS LNG来说,斯卡伯勒仍然可以成为反击

获取原文
获取原文并翻译 | 示例
           

摘要

The Scarborough gas feld ofshore Western Australia can still become a back- fll project for the 16.3mn t/yr North West Shelf (NWS) LNG venture when it is revisited for sanctioning in 2021, NWS LNG and Scarborough operator Australian independent Woodside Petroleum says. The Scarborough gas has been earmarked as feedstock for a 5mn t/yr second production train at the existing 4.3mn t/yr Pluto LNG plant that is also operated by Woodside, but the 31-year-old NWS LNG venture is facing declining output as its felds reach peak output. Woodside has further deferred NWS LNG’s existing backfll project — the Browse gas feld development — by a few months from its previous guidance of late 2021.
机译:西澳大利亚州西澳大利亚斯卡伯勒瓦·瓦尔德仍然成为1630万吨/年西北网架(NWS)LNG型企业的背部FLL项目,因为它被重新审视为2021年被批准,NWS LNG和Scarborough Operator澳大利亚独立伍德赛德石油说。 斯卡伯勒气体已被指定为5Mn T / YR第二生产火车的原料,在现有的4.3Mn T / YR Pluto LNG工厂,也由Woodside运营,但这31岁的NWS LNG企业正面临下降产量 它的FELDS达到峰值输出。 Woodside进一步推迟了NWS LNG现有的Backfll项目 - 浏览天然气公共发展 - 从2021年底之前的指导到了几个月。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号