...
首页> 外文期刊>Argus global LNG >Wheatstone LNG’s frst cargo expected in October
【24h】

Wheatstone LNG’s frst cargo expected in October

机译:惠斯通液化钢铁第一款货物预计十月

获取原文
获取原文并翻译 | 示例
           

摘要

Chevron’s 8.9mn t/yr Wheatstone LNG plant in Australia is now expected to load its frst cargo this month - the frst cargo was previously expected to load some time around 25 September. The Asia Venture vessel was initially scheduled to arrive at the Wheatstone export facility on 25 September, according to vessel tracking data and market participants. The vessel is at anchor off the port of Dampier in Western Australia, where the 4.3mn t/yr Pluto and 16.3mn t/yr North West Shelf facilities export their cargoes. It is unclear whether the Asia Venture will still be used to load Wheatstone’s frst cargo or whether it is just waiting to be repositioned. There is currently no vessel in the vicinity of Wheatstone.
机译:澳大利亚的Chevron的89mn T / YR惠斯通LNG工厂现在预计将于本月加载其FRST货物 - FRST货物预计将在9月25日左右加载一段时间。 根据船舶跟踪数据和市场参与者,亚洲风险船最初计划于9月25日在9月25日抵达惠斯通出口设施。 该船在西澳大利亚州唐港的锚定,4.3Mn T / Yr Pluto和16.3mn T / Yr西北西部货架设施出口货物。 目前尚不清楚亚洲冒险是否仍然用于装载惠斯通的FRST货物或是否刚等待重新定位。 目前在惠斯通附近没有船只。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号