Italy’s 5.7mn t/yr Adriatic LNG terminal allocated no regasifcation capacity for the next 10 gas years through its annual subscription process. The operator did not receive any requests, having ofered 1.2mn t/yr of regasifcation capacity and the associated 18 annual slots for the 2020-21 to 2029-30 gas years through the process, which ended on 1 July. The remaining unallocated capacity for the current gas year will be ofered on a shorter-term basis from August onwards. The terminal will ofer delivery slots for 9-12 November as well as for 11-14 and 23-26 December. Another 15 unloading slots will be ofered for January- September 2021, but the exact dates have not yet been specifed. The Adriatic terminal is also currently ofering capacity for the remainder of this gas year. It is ofering four slots for August and one slot for September through an auction that ends on 20 July.
展开▼