...
首页> 外文期刊>Argus Gas Connections >Norway’s Troll summer 2018 maintenance revised
【24h】

Norway’s Troll summer 2018 maintenance revised

机译:挪威的巨魔夏天2018年维护修订

获取原文
获取原文并翻译 | 示例
           

摘要

Maintenance at Norway’s 120mn m~3/d Troll field next summer has been rescheduled, with the heaviest production capacity cuts now expected to come in June rather than April. The field’s operator, state-controlled Statoil, has still detailed five periods of lower availability that are linked to offshore system operator Gassco’s planned 24 May halt. But Statoil cancelled one period planned for early to mid-May and announced for late May to early June. Production capacity will be restricted to some extent in every month next summer apart from July.
机译:挪威120mn M〜3 / D Troll Field的维护已重新安排,最重的生产能力削减现在预计将于6月而不是4月来。 该领域的运营商国家受控的attoil仍然详细五个较低的可用性,这些可用性与海上系统运营商Gassco计划的24可能停止。 但是,挪威国家石油公司在5月初提前预定了一段时间,并宣布于5月初至6月初。 在明年夏天的每个月外,生产能力将在某种程度上限制在7月份。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号