...
首页> 外文期刊>Argus Coal Transportation >NSW coal railway washed away by flood
【24h】

NSW coal railway washed away by flood

机译:南威尔士州煤炭铁路被洪水冲走了

获取原文
获取原文并翻译 | 示例

摘要

The rail line connecting coal mines in the western coal fields to the New South Wales (NSW) capital of Sydney and on to the port of Newcastle and Port Kembla has been further damaged by flooding that has caused a landslide under the track. The track had not reopened properly following damage caused by bushfires at the end of December, limiting the abil- ity of coal mines in the western coal fields to freight coal to NSW ports. It has now been further damaged by flooding over the weekend that washed away substrate, leaving part of the track suspended in the air and unpassable. The track operator, Sydney Trains, is unsure how long it will take to repair the line.
机译:将煤矿在西部煤炭领域的铁路线连接到新南威尔士(NSW)首都悉尼和纽卡斯尔港和Kembla的港口,因洪水而导致轨道下滑的洪水进一步损害。 在12月底森林大火造成的损失后,这条赛道没有重新打开,限制了西煤田的煤矿到货物煤炭到新南威尔士州港口的侵害。 在周末淹没的是洗掉基板的周末,它现已进一步损坏,留下悬浮在空气中的一部分轨道和无法递推。 赛道运营商悉尼列车是不确定修复该行的时间。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号