首页> 外文期刊>Africa oil and gas: Breaking news and analysis from Africa >Prequalification starts for Total East Africa pipeline
【24h】

Prequalification starts for Total East Africa pipeline

机译:资格预审开始全东非管道

获取原文
获取原文并翻译 | 示例
       

摘要

Total has now received expressions of interest from a series of keen contractors for the export pipeline to take crude from Uganda to the coast in Tanzania. Gulf Interstate Engineering began work on front end engineering and design in January with work to be finished in late August and the French operator is now moving ahead with the next stage for the 1,443km pipeline. Total invited the expressions of interest for the engineering, procurement and construction management contract on the East Africa crude oil pipeline (EACOP) in late May with a deadline date of 12 June.
机译:现在已经获得了一系列热衷于出口管道的兴趣表达的表达,以从乌干达到坦桑尼亚的海岸。 海湾州际工程开始在1月开始前端工程和设计工作,在8月下旬结束,法国运营商现在正在前进的1,443公里的管道前进。 在5月12日截止日期为6月12日截止日期,邀请了对东非原油管道(EACOP)的工程,采购和建筑管理合同的表达。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号