...
【24h】

NNPC testing Nigeria frontier appraisal

机译:NNPC测试尼日利亚前沿评估

获取原文
获取原文并翻译 | 示例
           

摘要

NNPC is running drill stem tests on its appraisal in a frontier basin in Nigeria as the government tries to diversify supply and power away from the Niger Delta.The Kolmani River-2 well spudded in OPL 809 in February in the northeast of the country in the Gongola Basin,the first well in the area in 20 years.Uncommercial quantities of crude and gas were discovered in Kolmani River by Shell in 1998 at the peak of a six-year search by multinationals in the basin.The company was unwilling to appraise the find and then gave up its three blocks.The current well follows on from new 3D seismic shot in 2017 and will drill to a much deeper 14,250ft(4,345m).It is being drilled by Etihad Oilfield Service's Ikenga 101 rig.Halliburton is now said to have been awarded the contract by NNPC's Frontier Exploration Services to run drill stem tests,implying the discovery of hydrocarbons.
机译:NNPC正在尼日利亚的前沿盆地的评估运行钻杆测试,因为政府试图将供应和权力分化远离尼日尔三角洲。在2月份在该国东北部在OPL 809的Kolmani River-2很好地努力 该地区的第一个井中的工厂盆地20年来。1998年在Kolmani River河在Kolmani River河在盆地的六年搜索的峰值中被发现,在盆地中的六年搜索。公司不愿意评估 找到并放弃了它的三个街区。目前的顺利在2017年新的3D地震射击次数,将深入钻出1.25英尺(4,345米)的更深。正在钻探Etihad Oilfield Service的Ikenga 101 Rig.Halliburton现在正在钻探 据说由NNPC的前沿勘探服务授予合同来运行钻杆测试,这意味着碳氢化合物的发现。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号