...
首页> 外文期刊>Aberdeen Petroleum Report >Mustang awarded front-end engineering design by Noble Energy
【24h】

Mustang awarded front-end engineering design by Noble Energy

机译:野马获得来宝能源颁发的前端工程设计奖

获取原文
获取原文并翻译 | 示例
           

摘要

Mustang, part of international energy services company John Wood Group PLC, has been selected by Noble Energy to perform front-end engineering design for the Belinda project in Block "O", which is located in approximately 243 feet (74 meters) of water offshore Equatorial Guinea. The scope of the FEED includes the design of both the jacket and topsides of the facility, which will process gas condensate. The Belinda project is being designed as a gas cycling project designed to strip condensate from the field and re-inject the gas for future sales.
机译:国际能源服务公司John Wood Group PLC的一部分Mustang被来宝能源(Noble Energy)选中,为位于“ O”区块的Belinda项目进行前端工程设计,该项目位于约243英尺(74米)的近海水域中赤道几内亚。 FEED的范围包括设备的夹套和顶侧的设计,该设备将处理冷凝水。 Belinda项目正被设计为一个气体循环项目,旨在从田地中去除冷凝水并重新注入天然气以供将来销售。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号