Evaluation of Baseline Schedule Metrics for Successful Project Schedule Performance

机译:评估基准进度指标以确保成功的项目进度绩效

获取原文
获取原文并翻译 | 示例

摘要

The development of a reasonable baseline schedule is a challenge for some construction professionals. Some construction projects experience schedule impacts or delays as a result of fatally flawed baseline schedules that produce an unreasonable forecasted completion. Accordingly, some organizations, public entities, private firms, software companies and consultants have developed checklists or guidelines for evaluating the mechanics of baseline schedules to improve the likelihood of forecasting a reasonable completion date. However, these guidelines have yet to be substantiated. The purpose of this paper is to identify and evaluate a list of industry-recognized metrics to determine whether a schedule is fatally flawed or suggests a reasonable forecast. Accordingly, this paper addresses the correlation between current Industry Metrics and developing a reasonable schedule. The findings are addressed after evaluating 27 current Industry Metrics against eight completed case projects within the commercial and university building sectors. The case projects are divided into two groups based on amount of delay. The analysis results show that between two groups there exist significant baseline schedule quality differences.
机译:对于一些建筑专业人士而言,制定合理的基准进度表是一项挑战。由于基准进度表存在致命缺陷,导致不合理的预测完成,因此某些建筑项目会遇到进度表影响或延迟。因此,一些组织,公共实体,私人公司,软件公司和顾问已经制定了清单或准则,以评估基准时间表的机制,以提高预测合理完成日期的可能性。但是,这些指南尚未得到证实。本文的目的是识别和评估一系列行业认可的指标,以确定时间表是否存在致命缺陷或提出合理的预测。因此,本文探讨了当前行业指标与制定合理时间表之间的相关性。在针对商业和大学建筑领域中八个已完成的案例项目评估了当前的27个行业指标后,解决了这些发现。案例项目根据延迟量分为两组。分析结果表明,两组之间存在明显的基准进度质量差异。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号