首页> 外文期刊>The TEX Report >Kumba Iron Ore's Production for 2Q20 Falls 20% Y/Y to 8.48 Mt
【24h】

Kumba Iron Ore's Production for 2Q20 Falls 20% Y/Y to 8.48 Mt

机译:Kumba Iron Ore的2Q20的生产落在20%Y / Y至8.48米

获取原文
获取原文并翻译 | 示例
           

摘要

Anglo American plc announced on 16th its operational performance for the second quarter (Apr-Jun) as well as the first half (Jan-Jun) of 2020 (2Q20 and 1H20, respectively). The iron ore production of Kumba Iron Ore ("Kumba"), South Africa, for 2Q20 stood at 8.475 million tonnes (Mt), down 19.6% year-on-year (y/y), due to labor shortage resulting from lockdown to control the spread of COVID-19. The work force, once halved, went back to the normal level in June. By mine, the quarterly production of flagship Sishen mine reduced by 20.9% y/y to 5.782 Mt, and that of Kolomela mine also decreased by 16.7% y/y to 2.693 Mt.
机译:Anglo American Plc于第16届第二季度(分别为2020年(2Q20和1H20和1H20)的第二季度的运作绩效。 南非2季度昆巴铁矿石(“Kumba”)的铁矿石生产总计为84.75亿吨(吨),同比下降19.6%(Y / Y),由于锁定造成的劳动力短缺 控制Covid-19的传播。 劳动力一度减半,六月回到正常水平。 由矿区,旗舰穗矿的季度产量降低了20.9%,达5.782吨,Kolomela矿区也减少了16.7%y / y至2.693米。

著录项

  • 来源
    《The TEX Report》 |2020年第12427期|共1页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类 工业经济;
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号