...
首页> 外文期刊>Platts Coal Trader International >Vattenfall starts Berlin gas plant as hamburg coal decision looms
【24h】

Vattenfall starts Berlin gas plant as hamburg coal decision looms

机译:Vattenfall开始柏林煤气厂作为汉堡煤决策织机

获取原文
获取原文并翻译 | 示例
   

获取外文期刊封面封底 >>

       

摘要

London—Vattenfall has started a new gas-fired heat and power plant in the Marzahn area of Berlin, the Swedish utility said June 3. The 260 MWe, 230 MWth unit is the third cogeneration gas plant the utility has opened in the German capital in recent years as it proceeds to phase-out coal-fired facilities. “Vattenfall has invested more than Eur300 million [$336 million] in the Marzahn plant and a total of around Eur1 billion in the past 10 years to reduce carbon dioxide emissions from our district heating, district cooling and electricity production in Berlin,” Vattenfall’s head of heat in Berlin Tanja Wielgoss said.
机译:伦敦 - Vattenfall在瑞典电厂在柏林的Marzahn地区开始了一家新的燃气热量和电厂,瑞典电力公司6月3日。260 MWE,230 MWE单位是第三个热电联产天然气厂,该厂在德国首都开业 近年来,它进入淘汰燃煤设施。 “Vattenfall在Marzahn工厂中投入了超过300万欧元”超过3.36亿美元“,在过去10年中共有约19亿欧元,以减少柏林的地区供暖,区冷却和电力生产的二氧化碳排放量,”Vattenfall的负责人 柏林坦贾维尔戈斯的热火说。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号