...
首页> 外文期刊>Oil Daily >Gas Plant Completed in Powder River Basin
【24h】

Gas Plant Completed in Powder River Basin

机译:煤气厂在粉末河流域完成

获取原文
获取原文并翻译 | 示例
   

获取外文期刊封面封底 >>

       

摘要

Meritage Midstream has completed construction of its Steamboat 1 natural gas processing plant in the Powder River Basin in Converse County, Wyoming. With a nameplate production capacity of 200 MMcf/d, the facility brings Meritage's processing capacity in the basin to 380 MMcf/d. Company officials said the facility is located on a site large enough to handle two additional 200 MMcf/d processing plants if future market conditions warrant an expansion. Meritage President Nick Thomas said the plant is in the southern area of the Powder River Basin, allowing the company to reach a significant gas market.
机译:Meritage中游在匡威县的粉末河流盆地的蒸汽船1天然气加工厂建造了普瓦明。 铭牌生产能力为200 mmcf / d,设施将MenItage在盆中的处理能力带到380 mmcf / d。 公司官员表示,如果未来的市场条件需要扩张,该设施位于足够大的网站,以处理两种额外的200 mmcf / d加工厂。 Meritage总统尼克托马斯表示,该植物位于粉末河流域的南部地区,允许该公司达到一个重要的天然气市场。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号