首页> 外文期刊>Natural gas intelligence >DAPL Girding for Battle as Court Seeks Formal Plans from All Sides
【24h】

DAPL Girding for Battle as Court Seeks Formal Plans from All Sides

机译:随着法院寻求各方面的正式计划,争夺战斗

获取原文
获取原文并翻译 | 示例
获取外文期刊封面目录资料

摘要

A U.S. district court has ordered the U.S. Army Corps of Engineers, Dakota Access Pipe- line (DAPL) and tribes led by the Standing Rock Sioux to provide proposals for next steps in the ongoing litigation surrounding the oil system’s continued operation. U.S. District Court Judge James Boasberg for the District of Columbia (DC) set a Tuesday (Sept. 8) deadline for submitting a formal posi- tion on the Army Corps plans to defer taking an enforcement action on DAPL’s “encroach- ment” at Lake Oahe. This essentially has kept oil fowing while a vacated easement permit is addressed.
机译:一位美国地区法院订购了美国军队的工程师,达科他接入管道(DAPL)和由常设Rock Sioux领导的部落,为下一步诉讼中的持续诉讼的后续步骤提供了建议。 美国地区法院法官James Boasberg为哥伦比亚区(DC)设定了一个星期二(9月8日)向陆军军团计划提交正式的核查计划,推迟在湖上的DAPL的“侵犯”执行执法行动 奥哈。 这基本上已经保持油炸,而腾出的地役权允许。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号