首页> 外文期刊>Metal Bulletin Daily >Zinc concs TC pressured by 1-month delivery delay after Queensland flood
【24h】

Zinc concs TC pressured by 1-month delivery delay after Queensland flood

机译:Queensland洪水之后,ZINC CONDS CONT TC在1个月的交付延迟

获取原文
获取原文并翻译 | 示例
获取外文期刊封面目录资料

摘要

The upward momentum in zinc concentrates spot treatment charges (TCs) may be capped by the lower availability of Australian concentrates due to the estimated month-late delivery of parcels from the flooded North Queensland area, several smelters told Fastmarkets.The floods in early February had blocked the railroad to the Port of Townsville, which is the export gateway for MMG's Dugald River mine and Glencore's Mount Isa and McArthur River mine, according to the company websites.
机译:锌浓缩物现货费用(TCS)的上升动力可能因澳大利亚浓缩物的较低可用性而被封存,由于洪水北昆士兰地区的估计延迟交付,几个冶炼厂告诉Flastmarkets。2月初的洪水有 根据公司网站的说法,封锁了Townsville港到汤斯维尔的港口,即MMG的Dugald River Mine和Glencore山Isa和Mcarthur River Mine的出口网关。

著录项

相似文献

  • 外文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号