首页> 外文期刊>Fertilizer Week >No bids at first La Oroya smelter auction
【24h】

No bids at first La Oroya smelter auction

机译:第一个La Oroya冶炼厂拍卖没有出价

获取原文
获取原文并翻译 | 示例
           

摘要

No company placed any bids in the first auction for Peru’s La Oroya smelter and the nearby Cobriza copper mine March 10, Reuters reported. The minimum price for the assets will be cut 15% from around $270 million in the second auction on March 21, with another 15% cut if a third and final auction is needed on March 30, according to Pablo Peschiera, director of consulting firm Dirige, which is managing the liquidation. Peschiera suggested that interested parties were likely waiting for the results of new air quality standards the environment ministry will release on March 17, as these could reduce necessary upgrade costs.
机译:据路透社报道,没有公司在秘鲁的La Oroya冶炼厂和附近的Cobriza Copper矿井附近的拍卖中发表任何出价。 咨询公司Dirige主任PabloPeschiera的第三次和最终拍卖,又在3月21日举行的第二次拍卖中削减了15%的价格。 ,这是管理清算。 Peschiera建议感兴趣的各方可能正在等待新的空气质量标准的结果,环境部将于3月17日发布,因为这些人可以减少必要的升级费用。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号