首页> 外文期刊>The pharmaceutical journal >Hall refurbishment completed
【24h】

Hall refurbishment completed

机译:大厅装修完成

获取原文
获取原文并翻译 | 示例
           

摘要

The refurbishment of the assembly hall at the London headquarters of the Royal Pharmaceutical Society has been completed on time and on budget.Building work that started in December 2005 has turned the old assembly hall into a conference suite with a glass roof allowing natural light into the main conference area.The new suite has a capacity of 230 with one large room that can be split into two or four small syndicate rooms.The suite also allows video conferencing in all meeting rooms,has.front and rear projection facilities and has an induction loop system for people with hearing difficulties.
机译:皇家制药协会伦敦总部大会堂的整修工作已按时,按预算完成。2005年12月开始的建筑工作已将旧的大会堂变成了一个带有玻璃屋顶的会议室,可将自然光射入会议室。主会议区。新套房可容纳230人,其中一间大会议室可分为两到四个小集团会议室。该套房还允许在所有会议室,前后投影设施中进行视频会议,并具有感应功能。听力障碍者的循环系统。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号