首页> 外文期刊>CRU Monitor: Lead & Zinc Concentrates >Zellidja lead plant may re-open
【24h】

Zellidja lead plant may re-open

机译:Zellidja铅厂可能重新开放

获取原文
获取原文并翻译 | 示例
           

摘要

News has emerged that Binani has signed a deal that could pave the way for the re-opening of Zellidja. This smelter has historically treated relatively low-silver lead concentrates, although customs figures suggest that it was treating some higher-silver tonnages from Peru in the lead-up to its closure in 2012. Although lead prices no doubt played a part, concentrate pricing was a significant influence too. TCs for low-silver tonnages had been falling. Realised contract TCs averaged $227/t in 2009-11, but slipped to $204/t in 2012 and to an average of $184/t in January-October 2013. Of course, terms for high-silver tonnages were much higher, but operating in this market is only feasible if you can recover all of the payable silver. And we understand that processing scrap was banned by the Moroccan government.
机译:有消息称,Binani已签署一项协议,这可能为Zellidja的重新开放铺平道路。尽管海关数据显示,该冶炼厂过去一直在处理相对较低的银精矿,但在2012年关闭之前,秘鲁一直在处理来自秘鲁的一些高银精矿。也会产生重大影响。低银吨的TC一直在下降。在2009-11年,已实现的合同热轧卷平均价格为$ 227 / t,但在2012年降至$ 204 / t,在2013年1月至10月平均降至$ 184 / t。当然,高银吨的条款要高得多,该市场只有在您可以收回所有应付白银的情况下才可行。我们知道摩洛哥政府禁止加工废料。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号