首页> 外文期刊>Platt's Oilgram News >Brazil’s Lapa Field expected to start production in August
【24h】

Brazil’s Lapa Field expected to start production in August

机译:巴西的Lapa油田有望于8月开始生产

获取原文
获取原文并翻译 | 示例
       

摘要

Rio de Janeiro-Petrobras expects to start pumping crude from the Lapa Field in the country’s subsalt frontier in August, after the recent arrival of the floating production unit that will handle output from the deposit, the state-owned Brazilian company said last week. The Cidade de Caraguatatuba floating production, storage and offloading vessel (FPSO), has already arrived at the field, located in Brazil’s Santos Basin about 270 km off the coast of Sao Paulo state, Petrobras said.
机译:国有巴西公司上周表示,里约热内卢-石油公司(Rio de Janeiro-Petrobras)预计将在8月开始从该国盐下边境的拉帕油田(Lapa Field)抽取原油,此前该浮动生产部门将负责处理该矿的产出。巴西国家石油公司说,Cidade de Caraguatatuba浮动生产,储存和卸货船(FPSO)已经抵达现场,该现场位于巴西圣保罗盆地,距圣保罗州海岸约270公里。

著录项

  • 来源
    《Platt's Oilgram News》 |2016年第120期|共1页
  • 作者

    Jeff Fick;

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

  • 入库时间 2022-08-19 14:27:24

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号