首页> 外文期刊>Platt's Oilgram News >Indonesia to start 15 new projects in 2012
【24h】

Indonesia to start 15 new projects in 2012

机译:印尼将于2012年启动15个新项目

获取原文
获取原文并翻译 | 示例
       

摘要

Jakarta—Indonesia’s upstream regulator BPMigas December 21 said 15 new oil and gas projects would start up next year, producing a total 1.16 Bcf/d of natural gas and 35,200 b/d of crude oil and condensate. The projects that are expected to come on stream in 2012 include Pertamina Hulu Energi’s KE-39, 40 and 54 fields in the West Madura Offshore block in East Java, BPMigas’ deputy head of operations Rudi Rubiandini told Platts. The fields will add 13,600 b/d by the third quarter to the output of the company, which is a subsidiary of state-owned oil and gas company Pertamina.
机译:雅加达-印度尼西亚上游监管机构BPMigas 12月21日表示,明年将启动15个新的油气项目,天然气总产量为1.16 Bcf / d,原油和凝析油产量为35,200 b / d。 BPMigas运营副主管Rudi Rubiandini告诉普氏能源资讯,预计这些项目将于2012年投入生产,其中包括Pertamina Hulu Energi在东爪哇的西马杜拉近海区块的KE-39、40和54油田。到第三季度,这些油田将使该公司的产量增加13,600桶/天,该公司是国有石油和天然气公司Pertamina的子公司。

著录项

  • 来源
    《Platt's Oilgram News》 |2011年第253期|共1页
  • 作者

    Anita Nugraha;

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

  • 入库时间 2022-08-19 14:23:47

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号