...
首页> 外文期刊>Oil Daily >Talk of Dakota Access Pipeline Reroute Roils Industry
【24h】

Talk of Dakota Access Pipeline Reroute Roils Industry

机译:达科他州接入管道重路由铁路行业的讨论

获取原文
获取原文并翻译 | 示例

摘要

After President Barack Obama mentioned the word "reroute" in an interview this week, it seems there are only two certainties about the $3.8 billion Dakota Access pipeline. One, the 1,172-mile North Dakota-to-Illinois oil pipeline being constructed by Energy Transfer Partners will not meet its end-of-year opening deadline. And two, the next president will likely inherit a messy situation that has become a cause celebre for Native Americans and environmental activists worldwide. Neither Democrat Hillary Clinton, who leads in the polls, nor opponent Republican Donald Trump has weighed in on the pipeline.
机译:在本周接受巴拉克·奥巴马(Barack Obama)总统采访时提到“改道”(reroute)一词之后,对于价值38亿美元的达科他通道(Dakota Access)管道似乎只有两个确定性。其中一条,由美国能源转移合作伙伴(Energy Transfer Partners)修建的长达1,172英里的北达科他州至伊利诺伊州的输油管道将无法满足其年底开放的最后期限。第二,下一任总统很可能会继承一个混乱的局面,这已成为美国原住民和全球环境活动家的当红明星。在民意调查中领先的民主党人希拉里·克林顿(Hillary Clinton)和反对派共和党人唐纳德·特朗普(Donald Republic Trump)都没有参与其中。

著录项

  • 来源
    《Oil Daily》 |2016年第4期|共1页
  • 作者

    Elizabeth McGowan;

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号