...
首页> 外文期刊>Oil Daily >Mexican Gas Pipeline Completed
【24h】

Mexican Gas Pipeline Completed

机译:墨西哥天然气管道完工

获取原文
获取原文并翻译 | 示例
   

获取外文期刊封面封底 >>

       

摘要

TransCanada said Monday that itsUS$360 million, 192-mile GuadalajaraPipeline in Mexico has been completed.The entire capacity of the 30-inch-diame-ter natural gas line is held under a 25-yearcontract with Comision Federal de Electrici-dad (CFE), Mexico’s state-owned electriccompany.The Guadalajara pipeline connects toan LNG regasification facility located nearManzanillo, in the state of Colima.It has the capacity to transport 500 MM-cf/d of natural gas to a nearby CFE-ownedpower plant and 320 MMcf/d to the Pemex-owned national pipeline system nearGuadalajara, in the state of Jalisco.
机译:TransCanada周一表示,墨西哥3.6亿美元,长达192英里的瓜达拉哈拉管道已经完工,这条30英寸直径天然气管道的全部生产能力与Comision Federal de Electrici-dad(CFE)签订为期25年的合同(墨西哥的国有电力公司)瓜达拉哈拉(Guadalajara)管道与位于科利马州曼萨尼约(Manzanillo)附近的液化天然气再气化设施相连,能够将500 MM-cf / d的天然气输送到附近的CFE拥有的电厂和320 MMcf / d至哈利斯科州瓜达拉哈拉附近Pemex拥有的国家管道系统。

著录项

  • 来源
    《Oil Daily》 |2011年第120期|共1页
  • 作者

    Oil Daily Group;

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号