首页> 外文期刊>Russia & CIS Metals & Mining Weekly >An riant Mining commissions 1 mln tpy heap leach facility at Tuva gold field
【24h】

An riant Mining commissions 1 mln tpy heap leach facility at Tuva gold field

机译:一家riant矿业公司在Tuva金矿委托100万吨/年堆浸设施

获取原文
获取原文并翻译 | 示例
           

摘要

Sweden's Auriant Mining AB fully commissioned a heap leaching facility at the Tardan gold field in Tuva on August 24.Design throughput capacity is 1 million tonnes of ore, graded at 9.4 g/t for gold, the company said in a statement. The plant can achieve a recovery rate of 58%. It should boost gold production to 1,000 kg per year in two years. Project costs were not disclosed."The commissioning will enable Auriant to significantly increase production levels and generate steady revenues from gold sales. Tardan being fully commissioned adds a great value for our shareholders," Denis Alexandrov, the company's CEO, was quoted as saying.
机译:瑞典公司Auriant Mining AB于8月24日全面启用了位于图瓦塔尔丹(Tardan)金矿的堆浸设施。该公司在一份声明中称,设计吞吐能力为100万吨矿石,金品位为9.4克/吨。该工厂的回收率可达到58%。它将在两年内将黄金产量提高到每年1000公斤。该公司首席执行官丹尼斯·亚历山德罗夫(Denis Alexandrov)表示:“调试将使Auriant能够显着提高产量并从黄金销售中获得稳定的收入。Tardan的全面调试为我们的股东带来了巨大价值。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号