...
首页> 外文期刊>Russia & CIS Metals & Mining Weekly >Gold output in Chukotka at 13.2 tonnes in Jan-Oct, silver production at 157.5 tonnes
【24h】

Gold output in Chukotka at 13.2 tonnes in Jan-Oct, silver production at 157.5 tonnes

机译:1月至10月楚科奇的黄金产量为13.2吨,白银产量为157.5吨

获取原文
获取原文并翻译 | 示例

摘要

Gold production enterprises in Chukotka produced 13.2 tonnes of hardrock gold and 157.5 tonnes of silver in January-October 2012, the region's information policy department said on November 9. Precious metals production is now underway in Chukotka at two fields: Kupol and Karalveyem. The bulk of production in the period, 12 tonnes of gold and 157.4 tonnes of silver, was received from the Kupol mine (belonging to CJSC Chukotka Mining and Geological Company, a subsidiary of Canada's Kinross Gold).
机译:该地区的信息政策部门在11月9日表示,楚科奇的黄金生产企业在2012年1月至10月生产了13.2吨硬岩金和157.5吨白银。该时期的大部分产量(12吨黄金和157.4吨白银)来自Kupol矿山(属于加拿大Kinross黄金的子公司CJSC Chukotka采矿和地质公司)。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号