...
首页> 外文期刊>Creamer Media's Mining Weekly >Iron project in northern Bushveld, platinum mine builder cuts risk, diamond mine coming on stream
【24h】

Iron project in northern Bushveld, platinum mine builder cuts risk, diamond mine coming on stream

机译:布什维尔德北部的铁矿项目,铂金矿建设商降低了风险,钻石矿开始投产

获取原文
获取原文并翻译 | 示例

摘要

IRON ASPIRANT IRONVELD, WHICH IS LISTED on London's Aim, expects to be producing pig iron on the northern limb of the Bushveld Complex at pilot level by the middle of next year. Read on page 6 of this edition of Mining Weekly of the 12 MW pilot project being a precursor to a far larger 300 MW production complex in late 1918. The Aim-listed Ironveld expects to mine 2.4-million tons of magnetite a year as feedstock for its eventual million-ton-a-year pig-iron plant, which will also produce vanadium and titanium by-products. What the now troubled Highveld Steel & Vanadium has been doing for more than 50 years is what Ironveld will be doing with a lot more modern equipment and more modern processing techniques on a resource that has 32-million tons of recoverable iron. Ironveld is aligning itself with the drive of the South African government to beneficiate the ore and not just export it, which will earn it significantly reduced mineral royalty payments.
机译:铁的阿斯皮兰特铁(ERON ASPIRANT IRONVELD)已列入伦敦的目标市场,预计到明年年中,将在试点的布什维尔德综合体的北端生产生铁。请阅读本版《采矿周刊》第6版的第6页,这是1918年下半年规模更大的300兆瓦生产综合设施的前身。在目标投资管理公司名单上的Ironveld希望每年开采240万吨磁铁矿作为生产其最终的年产百万吨的生铁厂,还将生产钒和钛的副产品。现在陷入困境的Highveld Steel&Vanadium过去50多年来一直在做的事情是Ironveld将在拥有3200万吨可回收铁的资源上使用更多现代设备和更现代加工技术来做。 Ironveld正在使自己适应南非政府选矿而不只是出口矿石的动力,这将使它大大减少矿产使用费的支付。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号