首页> 外文期刊>Metal Bulletin >Core Mining targets 35m-tpy iron ore output at Avima project, with start scheduled for 2017
【24h】

Core Mining targets 35m-tpy iron ore output at Avima project, with start scheduled for 2017

机译:Core Mining的目标是Avima项目的年产3500万吨铁矿石,计划于2017年开始

获取原文
获取原文并翻译 | 示例
获取外文期刊封面目录资料

摘要

Privately owned exploration company Core Mining's Avima iron ore project in the Republic of Congo, on the country's borders with Cameroon and Gabon, is eyeing a start to production in 2017. But faced with a tight funding environment and major infrastructure hurdles, there are questions over whether Avima has what it takes to bring its iron ore on stream. Metal Bulletin sistertitle Steel First's Nina Nasman spoke to Core ceo Socrates Vasiliades.
机译:私有勘探公司Core Mining在刚果共和国(位于喀麦隆和加蓬的边界)在刚果共和国的Avima铁矿石项目正准备在2017年开始生产。但是,由于资金环境紧张和基础设施面临重大障碍,存在一些疑问Avima是否具备将其铁矿石投入生产的条件。 Metal Bulletin的姐妹标题Steel First的Nina Nasman与Core CEO Socrates Vasiliades进行了交谈。

著录项

  • 来源
    《Metal Bulletin》 |2013年第9295期|共1页
  • 作者

    NIHA NASMAN;

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号