首页> 外文期刊>Metal Bulletin >Comalco to decide on Queensland alumina refinery by November
【24h】

Comalco to decide on Queensland alumina refinery by November

机译:Comalco将在11月之前决定昆士兰氧化铝精炼厂

获取原文
获取原文并翻译 | 示例
           

摘要

Australian aluminium producer Comalco expects to make a decision on whether to proceed with construction of a new alumina refinery in Queensland by the beginning of November this year.The Brisbane-based Rio Tinto subsidiary is still considering its options for the proposed refinery, which would be built in the northern suburbs of Gladstone, across town from the Queensland Alumina Ltd (QAL) refinery in which Comalco has a minority interest."A few things still need to be sorted out," said a senior Comalco official. "But we expect a decision by the start of November." He added that, following the release of Rio Tinto's half-yearly results in early August, ceo Leigh Clifford stated that a decision on the new refinery would be made within three months.
机译:澳大利亚铝生产商Comalco希望决定是否在今年11月初之前在昆士兰州建设一个新的氧化铝精炼厂。布里斯班的力拓子公司仍在考虑对拟建的精炼厂的选择。该公司建在格拉德斯通(Gladstone)的北郊,与昆士兰氧化铝有限公司(QAL)精炼厂对面,Comalco在这家精炼厂中只占少数股份。“ Comalco的一位高级官员说,还有一些事情需要解决。” “但我们预计将在11月初做出决定。”他补充说,继力拓(Rio Tinto)于8月初发布半年度业绩后,首席执行官雷·克利福德(Leigh Clifford)表示,将在三个月内做出新炼油厂的决定。

著录项

  • 来源
    《Metal Bulletin》 |2001年第8606期|共1页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号