...
首页> 外文期刊>E&P daily >Cameroon wells spudded
【24h】

Cameroon wells spudded

机译:喀麦隆的油井

获取原文
获取原文并翻译 | 示例

摘要

Gaz du Cameroun has spudded development wells La-107 and La-108 in the Logbaba gas field in Douala, Cameroon. “The new wells are required to meet the growing market demand for gas in Douala, to develop Logbaba reserves and to move some of the 2P (Proven plus Probable) reserves into the 1P (Proven) reserve category,” said the operator. Both wells will be drilled directionally from a drilling pad adjacent to the Logbaba processing plant and will be tied into the facility when they have been completed.
机译:Gaz du Cameroun在喀麦隆杜阿拉的Logbaba气田开辟了La-107和La-108钻井。该运营商说:“新井必须满足杜阿拉对天然气不断增长的市场需求,以开发Logbaba储量并将部分2P(探明储量和概算)储量转移到1P(探明储量)储量类别,”该运营商说。两口井将从与Logbaba加工厂相邻的钻井平台定向钻出,并在完井后绑在设施中。

著录项

  • 来源
    《E&P daily》 |2016年第3期|共1页
  • 作者

    Eamp; P daily Group;

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号