首页> 外文期刊>International Oil Daily >Oman's Mukhaizna Project on Track, but Economics Are Key
【24h】

Oman's Mukhaizna Project on Track, but Economics Are Key

机译:阿曼的Mukhaizna项目进展顺利,但经济学至关重要

获取原文
获取原文并翻译 | 示例
           

摘要

Oil production from the Occidental-op-erated Mukhaizna field in Oman nowstands at 125,000 barrels per day, but theoriginal target of 150,000 b/d may bescrapped if the economics don't stack up,according to Maurizio La Noce, the CEO ofone of Oxy's Mukhaizna partners, AbuDhabi-owned Mubadala.The acreage forms part of Block 53,which was awarded to Oxy and its part-ners in 2005 after being carved out of Pe-troleum Development Oman's (PDO) giantBlock 6. Original plans called for produc-tion to increase to 150,000 b/d by 2011using large-scale steam injection from10,000 b/d or less.
机译:Oxy's一位首席执行官的毛里齐奥·拉·诺斯(Maurizio La Noce)认为,从阿曼的西方人操作的穆哈伊兹纳油田的石油产量目前为每天125,000桶,但如果不增加经济总量,则最初的目标15万桶/天可能会被废除。 Mukhaizna的合作伙伴是阿布扎比拥有的Mubadala。该土地是53区块的一部分,该区块是在从阿曼石油开发(PDO)巨人6区块中剔除后于2005年授予Oxy及其合作伙伴的。原始计划要求生产-到2011年,采用大规模蒸汽注入技术将产量从10,000 b / d或以下提高到150,000 b / d。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号