首页> 外文期刊>東芝レビュー >Application of improved systems and components to Hamaoka nuclear power station unit No.5
【24h】

Application of improved systems and components to Hamaoka nuclear power station unit No.5

机译:改进的系统和组件在滨冈5号核电站的应用

获取原文
获取原文并翻译 | 示例
           

摘要

Construction work has begun on Hamaoka Nuclear Power Station Unit No. 5 of Chubu Electric Power Co., Inc. This is a 1,380 MWe advanced boiling water reactor (ABWR), the commercial operation of which is scheduled for January 2005. The design ofthe plant is based on that of Kashiwazaki-Kariwa NPS Unit No. 6 of The Tokyo Electric Power Co., Inc., the world's first ABWR. However, various newly designed and improved systems and components have been applied to improve the reliability and economicsof the plant.
机译:中部电力株式会社Ham冈核电站5号机组的建设工作已经开始。这是一座1,380 MWe的先进沸水反应堆(ABWR),计划于2005年1月投入商业运行。该电厂的设计它基于世界上第一台ABWR东京电力有限公司的柏崎崎-Kariwa NPS装置6号装置。但是,已经应用了各种新设计和改进的系统和组件来提高工厂的可靠性和经济性。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号