...
首页> 外文期刊>石川島播磨技報 >Manufacture of Spring-8 beamline components
【24h】

Manufacture of Spring-8 beamline components

机译:制造Spring-8梁线组件

获取原文
获取原文并翻译 | 示例
           

摘要

IHI has much experience of me manufacture of synchrotron radiation beamline components. IHI delivered monochromators for the Photon Factory at KEK (High Energy Accelerator Research Organization) in the 1980s. IHI started manufacture of synchrotron radiation beamline after development of its own compact synchrotron radiation source in 1989. IHI manufactured the beamline components of large synchrotron radiation facility, SPring-8. IHI delivered the insertion device for soft X-ray, front end system,wire type position monitor, double crystal monochromator, high energy X-ray monochromator, X-ray mirror, silicon crystal and radiation shield hutch. Basic parameters of the components are standardized and the number of beamlines will increase.
机译:IHI在制造同步辐射束线部件方面拥有丰富的经验。 IHI于1980年代为KEK(高能加速器研究组织)的光子工厂交付了单色仪。 IHI于1989年开发了自己的紧凑型同步加速器辐射源之后,便开始制造同步加速器辐射束线。IHI制造了大型同步加速器辐射设施SPring-8的束线组件。 IHI提供了用于软X射线的插入设备,前端系统,线型位置监视器,双晶体单色仪,高能X射线单色仪,X射线镜,硅晶体和辐射防护罩。组件的基本参数已标准化,并且束线的数量将增加。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号