...
首页> 外文期刊>Biopreservation and biobanking >Repository Planning, Design, and Engineering: Part IIEquipment and Costing
【24h】

Repository Planning, Design, and Engineering: Part IIEquipment and Costing

机译:储存库计划,设计和工程:第二部分设备和成本核算

获取原文
获取原文并翻译 | 示例
           

摘要

Part II of this article discusses and provides guidance on the equipment and systems necessary to operate a repository. The various types of storage equipment and monitoring and support systems are presented in detail. While the material focuses on the large repository, the requirements for a small-scale startup are also presented. Cost estimates and a cost model for establishing a repository are presented. The cost model presents an expected range of acquisition costs for the large capital items in developing a repository. A range of 5,000-7,000 ft(2) constructed has been assumed, with 50 frozen storage units, to reflect a successful operation with growth potential. No design or engineering costs, permit or regulatory costs, or smaller items such as the computers, software, furniture, phones, and barcode readers required for operations have been included.
机译:本文的第二部分讨论并提供了操作存储库所需的设备和系统的指南。详细介绍了各种类型的存储设备以及监视和支持系统。在材料集中于大型存储库的同时,还介绍了小型启动的要求。介绍了成本估算和用于建立存储库的成本模型。成本模型提供了开发存储库中大型资本项目的预期购置成本范围。假定建造的范围为5,000-7,000 ft(2),带有50个冷冻存储单元,以反映成功的运营并具有增长潜力。不包括设计或工程成本,许可或监管成本,或操作所需的较小物品,例如计算机,软件,家具,电话和条形码读取器。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号