首页> 外文期刊>Journal of intelligent & fuzzy systems: Applications in Engineering and Technology >Risk ranking in mega projects by fuzzy compromise approach: A comparative analysis
【24h】

Risk ranking in mega projects by fuzzy compromise approach: A comparative analysis

机译:模糊折衷方法在大型项目中的风险排名:比较分析

获取原文
获取原文并翻译 | 示例
           

摘要

This paper investigates the importance of risk ranking in mega projects by fuzzy compromise programming methods. To handle the limited resources problem to manage all risks, organizations can assess and prioritize important risks of mega projects. Three well-known decision-making methods, namely TOPSIS, VIKOR, and LINMAP, are employed in a fuzzy environment. One important issue considered in selecting the most appropriate fuzzy decision-making methods is the problem domain and method characteristics. Failing to address these characteristics may result in inappropriate outcomes or decisions. These methods are applied and compared for solving a risk ranking problem in a domain of mega projects. For the comprehensive study, six new aspects are introduced, including accuracy of methods, computational simplicity, large-scale problems, sensitivity to the parameters, discriminative measure, and inconsistency. Furthermore, a new fuzzy VIKOR method is extended in three different ways resulting in three different approaches to help project managers in handling mega project risks. Finally, the proposed fuzzy compromise approach is demonstrated with a real case study in the power industry.
机译:本文通过模糊折衷规划方法研究了大型项目中风险排名的重要性。为了处理有限的资源问题以管理所有风险,组织可以评估大型项目的重要风险并确定优先级。在模糊环境中采用了三种著名的决策方法,即TOPSIS,VIKOR和LINMAP。选择最合适的模糊决策方法时要考虑的一个重要问题是问题域和方法特征。无法解决这些特征可能导致不适当的结果或决策。应用这些方法并进行比较,以解决大型项目领域中的风险排名问题。为了进行全面的研究,引入了六个新方面,包括方法的准确性,计算的简单性,大规模问题,对参数的敏感性,区分性度量和不一致。此外,以三种不同的方式扩展了一种新的模糊VIKOR方法,从而产生了三种不同的方法来帮助项目经理处理大型项目风险。最后,在电力行业中通过实际案例论证了所提出的模糊折衷方法。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号