首页> 外文期刊>Journal of intelligent & fuzzy systems: Applications in Engineering and Technology >Uncertain block replacement policy with no replacement at failure
【24h】

Uncertain block replacement policy with no replacement at failure

机译:不确定的块替换策略,失败时不替换

获取原文
获取原文并翻译 | 示例
       

摘要

In this paper, we consider a block replacement policy with no replacement at failure and apply it to a system consisting of a new type of units. Due to the absence of historical data of lifetimes of new units, we fail to obtain the probability distribution of lifetimes. In this case, some domain experts are invited to provide belief degree of lifetime to estimate its distribution. However, human beings often overestimate unlikely events, which makes the variance of belief degree is much greater than that of the frequency. In order to deal with this problem, we assume the lifetime of the unit to be an uncertain variable. An uncertain block replacement model with no replacement at failure is proposed, and the existence condition of the optimal replacement time is given. Finally, a numerical example and sensitivity analysis are provided to illustrate the utility of the proposed model in practice.
机译:在本文中,我们考虑了在故障时不进行替换的块替换策略,并将其应用于由新型单元组成的系统。由于缺乏新设备寿命的历史数据,我们无法获得寿命的概率分布。在这种情况下,将邀请一些领域专家提供生命周期的置信度以估计其分布。然而,人类经常高估不太可能发生的事件,这使得信念度的方差远大于频率的方差。为了解决这个问题,我们假设设备的寿命是不确定的变量。提出了一种失效时无替换的不确定块替换模型,并给出了最优替换时间的存在条件。最后,提供了一个数值示例和敏感性分析来说明所提出的模型在实践中的实用性。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号