首页> 外文期刊>Coke and chemistry >Primary Cooling of Coke Gas. Its Cleaning from Tar Substances and Naphthalene in Electrical Filters
【24h】

Primary Cooling of Coke Gas. Its Cleaning from Tar Substances and Naphthalene in Electrical Filters

机译:焦炭气的初次冷却。从电气过滤器中清除焦油物质和萘

获取原文
获取原文并翻译 | 示例
           

摘要

In May, 1998, the Russian Metallurgical Company Close Corporation commissioned the first phase of the facility for collecting the chemical by-products of the coking process with primary gas coolers and electric filters, which was designed and built according to the project and contract with the Krupp Koppers Company. According to the project, eight primary gas coolers with horizontal tubes of high throughput (40000 m~3/h each) and six electric filters should be mounted.
机译:1998年5月,俄罗斯冶金公司关闭公司启用了该设备的第一阶段,该设备用于收集炼焦过程中的化学副产品,该设备使用一次气体冷却器和电过滤器,并根据该项目设计和建造,并与克虏伯·科珀斯公司。根据该项目,应安装8台主要的气体冷却器,该冷却器配有高吞吐量的水平管(每个40000 m〜3 / h)和6个电过滤器。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号