Pressure control of GLNG gas pipeline compliant with Australian standard requirements

机译:符合澳大利亚标准要求的GLNG天然气管道的压力控制

获取原文
获取原文并翻译 | 示例
       

摘要

The GLNG Consortium, formed by Santos, Total, Petronas and Kogas, is planning a large scale development to extract coal seam gas (CSG) from existing and future fields in the Roma, Fairview and Arcadia Valley area (Queensland, Australia) and to supply that gas for commercial sale and/or conversion to liquefied natural gas (LNG). A gas transmission pipeline called the "GLNG Pipeline" is a major component of the development. The GLNG Pipeline will be approximately 420 km in length and will be used to transport (CSG) from the existing and future fields to an LNG processing facility at Curtis Island near Gladstone (LNG Plant). Three inlets are foreseen in the initial pipeline section: 1.F-PCS-01 at KPO 2.Future F-HCS-05 at KP12.4 3.Future A-HCS-01 at KP52.3 The detail engineering phase of the pipeline is under completion, and the construction activities have already started in 2013. Saipem is in charge for both activities. This paper describes the process and flow assurance related characteristics of the GLNG Pipeline pressure control system developed during detail engineering, compliant with the requirements established by the adopted design standard, i.e. AS2885.1. The control system, ensuring adequate overpressure protection, allows a safe operation taking care of envisaged pipeline operating pressure, close to MAOP, and downward slope, causing risk for excessive pressurization of lower downstream sections.
机译:由Santos,Total,Petronas和Kogas组成的GLNG联盟正计划进行大规模开发,以从Roma,Fairview和Arcadia Valley地区(澳大利亚昆士兰州)的现有和未来气田中提取煤层气(CSG)并进行供应用于商业销售和/或转化为液化天然气(LNG)的气体。天然气输送管道称为“ GLNG管道”,是该开发项目的主要组成部分。 GLNG管道的长度约为420公里,将用于从现有油田和未来油田运输(CSG)到位于Gladstone附近的Curtis岛的LNG处理设施(LNG工厂)。最初的管道部分预计将有三个入口:1. KPO的F-PCS-01 2. KP12.4的未来F-HCS-05 3. KP52.3的未来A-HCS-01这项工作目前已经完成,并且建设活动已于2013年开始。塞佩姆负责这两项活动。本文描述了详细工程期间开发的GLNG管道压力控制系统的过程和流量保证相关特性,该系统符合采用的设计标准(即AS2885.1)确定的要求。该控制系统确保足够的过压保护,可确保安全运行,并注意预期的管道工作压力,接近MAOP的压力和向下倾斜的情况,从而导致下部下游部分过度加压的风险。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号